Appendix C
Integrated Road, Water and Sewer Projects
Ward Project From To Cost ($M) Cumulative Amount ($M) Job Creation
15 Churchill Ave -
Phase 1 of 3
(limits to be confirmed) (limits to be confirmed) 7.5 7.5 86.2
18 Pleasant Park Rd Haig Dr Delmar Dr 5.0 12.5 57.5
14 Argyle Cartier St Elgin St 5.0 17.5 57.5
Park Ave Elgin St Queen Elizabeth Drwy
Queen Elizabeth Way Park Ave McLeod St
12 Sussex Drive George St Patrick 6.0 23.5 69.0
16 Stormont St Apeldoorn Ave Ortona Ave 4.0 27.5 46.0
Apeldoorn Ave Stormont St Normandy (S)
7 Pinewood Richmond Rd Harwood 3.5 31.0 40.2
20 8th Line Rd Victoria St. 180 m S of Van Rens St. 2.5 33.5 28.7
Lloyd Graham Ave. 8th Line Rd. Bowen St.
Bowen St. Lloyd Graham Ave. Creek north of
Lloyd Graham
11 Triole St. Railroad
(north of Belfast Rd)
South Dead End 3.0 36.5 34.5
18 Tremblay Rd. Transitway Avenue R 4.5 41.0 51.7
8 Indian
(St Claire Gardens Phase 2)
Rita Meadowlands 5.0 46.0 57.5
17 Cambridge St S Dead End Carling Ave 3.0 49.0 34.5
Jackson Ave Frederick Pl Dow's Lake Rd
(Opeongo Rd)
Frederick  Pl Cambridge Ave Jackson Ave
13 Sandridge Rd. Hillsdale Rd. Merriman Ave. 8.0 57.0 92.0
15 Tweedsmuir Ave Carling Ave Clare St 6.0 63.0 69.0        
TOTAL       63.0   724