8.1 Capital Works Plan


Transportation system improvements will be made based on need, as determined through monitoring of transportation system performance and land development, and the City’s ability to pay for them.

Figures 8.1 to 8.4 identify the implementation phasing of the required infrastructure projects in a manner that will provide desired transportation service levels to a growing population. The phasing provides the basis for preparation of annual budgets and long range financial plans. Wherever possible, attempts will be made to shorten the timeline for delivery of these projects. While time phases have been identified for reference purposes, it is population levels that determine transportation demand rather than simply the passing of time. The indicated time horizons must therefore be considered to be approximations subject to change.

As noted above, the City’s ability to pay for projects will influence its project priorities and the rate of implementing them. The current Capital Budget document has identified a substantial “funding gap” in the City’s ability to pay for new capital projects. If the City cannot tap into new revenue sources, it will have to consider a range of possible solutions including program cutbacks, adjustments in standards and service levels, deferral of infrastructure, constraints on growth, user fees or tax rate increases. The annual budget process will remain the City’s principal forum for deciding how to spend available capital funds. Funding shortfalls will require choices to be made among different projects.

Figures 8.1 to 8.4 present the key transportation infrastructure projects for respectively: walking and multi-use pathways, cycling, transit and road. Annex A provides additional project details.

Table 8.1 - Phasing of Required Walking and Multi-use Pathway Infrastructure Projects

Phase 1 - 2009-2015

Project

Limits

Algonquin / Woodroffe Avenue Pedestrian Overpass

From Algonquin College to the Baseline Transitway Station

Alta Vista Transportation Corridor

From Hurdman Transit Station / Rideau River to Alta Vista Transportation Corridor to existing trail on Conroy Road

Bayview Station / Ottawa River Pathway link

From the Bayview O-Train Station to the Ottawa River Pathway

Coventry Road / Baseball Stadium Pedestrian Crossing

From the baseball stadium to the Train Transitway Station

Rural
Prescott-Russell Pathway linkage

Along former CP (now VIARail) rail corridor between eastern border of the City and Innes Road (west of Highway 417)

Woodroffe Avenue Corridor

From Baseline Transitway Station to Fallowfield Road; Fallowfield to Greenbank via rail/transit corridor

Phase 2 - 2016-2022

Project

Limits

Carp River / Terry Fox Drive Corridor

Along the Carp River and the Terry Fox Drive corridor from North Kanata to South Kanata

Greenbank Road Corridor

Reconstruction of pathway through the Greenbelt; construction of new pathways from Southern Corridor to Hunt Club Road, and Fallowfield to Jock River Corridor

Jock River Corridor

Along Jock River from Highway 416 to Prince of Wales Drive

Prince of Wales Drive Corridor

Hogs Back Road to southern limit of the Greenbelt

Riverside Drive / River Road Corridor

Hunt Club Road to southern limit of the Greenbelt

Phase 3 - 2023-2031

Project

Limits

Alta Vista Drive to Ogilvie Road Corridor

From Ottawa Hospital General Campus through industrial and rail lands over the Queensway to Ogilvie Road and the Aviation Parkway

Earl Armstrong Road Corridor

River Road to Greenbelt at Bowesville Leitrim Road; parallels road corridor

Eastern Corridors

From Alta Vista Transportation Corridor to Southern Cross-town Corridor

Orléans South Corridor

From Greenbelt at Navan Road to Cardinal Creek via Blackburn Bypass / transit and hydro corridor

Sawmill Creek Corridor via Airport Parkway

Following Sawmill Creek from the Rideau River to Hunt Club and to Blossom Park

Trim Road / Cardinal Creek

From Petrie Island to Frank Kenny Drive

Southern Cross town Corridor

Woodroffe Avenue to Rideau River; Rideau River to Highway 417 East

Note 1: Both the phasing and listing of projects in this table are subject to update once the Ottawa Pedestrian Plan is Council approved.

Table 8.2 - Phasing of Required Cycling Infrastructure Projects

Phase 1 - 2009-2015

Project

Limits

Alta Vista Transportation Corridor

Multi-use pathway between the Lees Avenue at Nicholas interchange and Conroy Road at Walkley Road, all parallel to future AVTC

Aero Drive

Short on-road connection between Holly Acres Road to east of Inkster Street

Baseline Road / Heron Road

Cycling lanes along these roads between Pinecrest Road (Greenbank) in the west and Walkley Road in the east

Greely / Metcalfe villages link

On and off-road multi-use pathway connection between the villages of Greely and Metcalfe

March Road

Bicycle lanes or paved shoulders between Terry Fox Road and Dunrobin Road

Nicholas Street / Madame Curie Private

Improvements to cycling connection at the Campus Station underpass to the Transitway and Colonel By Drive

North Service Road

Improvements to the off-road multi-use pathway, which is part of the Ottawa River pathway, between Tenth Line and Trim Roads

Prescott-Russell Pathway linkage

Along former CP (now VIARail) unused rail corridor between eastern border of the City and Innes Road (west of Highway 417)

Prince of Wales Drive

Cycling Lanes between Meadowlands Drive/Hog’s Back Road and Nesbitt Place

Richmond Road

Cycling lanes and paved shoulders between Moodie Drive and Churchill Avenue

Richmond Road

Paved shoulders between Stonehaven Drive and West Hunt Club Road

Rideau Canal / Rideau River connection

New multi-use pathway between Campus Transit Station, Robinson Avenue and University of Ottawa’s Lees Avenue campus

Scott Street / Albert Street

Bicycle lanes between Churchill Avenue and Lebreton Flats

South Keys connection

Multi-use pathway link between South Key Transitway Station and the residential community to the west of the Airport Parkway

Note 1: The projects listed are Phase 1 priorities and this table is subject to change to include other cycling infrastructure projects that are needed to implement the cycling network as set out in the approved Ottawa Cycling Plan.

Table 8.3 - Phasing of Required Transit Infrastructure Projects

Increment

Project

Description

1

LRT

Downtown tunnel; conversion to LRT of the East Transitway from Blair station to downtown and the West Transitway from Tunney’s Pasture to downtown

1

BRT

Southwest Transitway – from Fallowfield Road to Barrhaven Town Centre
Southwest Transitway – from Baseline station to Norice Street
West Transitway – from Bayshore to Moodie Drive
Cumberland Transitway – from Blair station to Innes Road
Cumberland Transitway – from Innes Road (at Blair) to Navan Road (at hydro corridor)

1

Supplementary (transit priority)

Strandherd Drive – from Rideau River to Woodroffe Park and Ride (includes bus lanes on Strandherd/Armstrong bridge)

Woodroffe Avenue – from Woodroffe Park & Ride (at Strandherd Road) to Fallowfield Park and Ride

1

Other

Nicholas Connection (new bridge over Rideau River and Lees Avenue)

2

LRT

East-West LRT – conversion to LRT of West Transitway from Tunney’s Pasture to Baseline

North-South LRT – twinning and conversion of O-Train route from Bayview to South Keys

3

LRT

North-South LRT – from South Keys to Riverside South Town Centre

3

BRT

Cumberland Transitway – from Navan Road to Trim Road (at Millennium)

West Transitway – from Eagleson Road to Scotia Bank Place (south of Highway 417)

Phase 2

Project

Description

LRT

North-South LRT Airport Spur – North-South LRT to Airport

BRT

West Transitway – from Lincoln Fields to Pinecrest Road
Southwest Transitway – from Norice Street to Hunt Club Road
Kanata North Transitway – from Eagelson Road to Klondike Road
West Transitway – from Scotia Bank Place to Fernbank Road
Barrhaven-Riverside South Transitway – from Barrhaven Town Centre to Riverside South Town Centre
Southwest Transitway – from Barrhaven Town Centre to Cambrian Road
Hospital Link Transitway – from Southeast Transitway (at Lycée Claudel) to Blair Road (at Innes Road)
East Transitway – from Place D’Orléans to Trim Road

Supplementary (LRT)

Carling Avenue LRT – from Lincoln Fields to North-South LRT at Carling/Preston

Supplementary (transit priority)

Baseline Road – from Bayshore Drive to Baseline station
Baseline Road – from Baseline station to Confederation station
Heron-Walkley-Russell-St. Laurent – from Confederation station along this corridor to the Hospital Link Transitway (at Innes)

Table 8.4 - Phasing of Required Major Roads Infrastructure Projects

Phase 1

Sector

Project

Description

East

Belcourt Boulevard

Widen from two to four lanes and new four-lane road, from Innes Road to Renaud Road

East

Belcourt Boulevard / Mer Bleue Road connection

New four-lane road, south of Innes Road, from Belcourt Boulevard to Mer Bleue Road

East

Blackburn Hamlet By-pass Extension

New two-lane road (later four lane), two sections: Navan Road at hydro corridor to Tenth Line Road and Portobello Boulevard to Trim Road

East

Mer Bleue Road

Widen from two to four lanes from Innes Road to south of Renaud Road

East

Ottawa Road 174

Widen from five to six lanes from Highway 417 to Blair Road

East

Portobello Boulevard

Widen from two to four lanes from Charest Way to the Blackburn Hamlet By-pass Extension

East

Trim Road

Widen/re-align Trim Road from two to four lanes from North Service Road north of Ottawa Road 174 to Blackburn Hamlet By-Pass Extension

West

Campeau Drive

Widen from two to four lanes from Didsbury Road to Kanata Road and new four-lane road from Didsbury Road to new North-South arterial in Kanata West

West

Golf Club Way (Country Club) /Jinkinson Road

New two-lane service road parallel to widened Highway 7 between the existing Jinkinson Road and the Country Club subdivision near Dwyer Hill Road

West

Goulbourn Forced Road re-alignment

Re-aligned and new two-lane road from Terry Fox Drive to Kanata Avenue

West

Hazeldean Road

Widen from two to four lanes from Iber Road to Terry Fox Drive

West

Hope Side Road/ Crown Ridge Road

New two-lane road from Richmond Road Moodie Drive, includes completion of Crown Ridge Road

West

Kanata Avenue

Upgrade existing two-lanes from Terry Fox Drive to Goulbourn Forced Road

West

March Road

Widen from two to four lanes from Morgan’s Grant Way to Old Carp Road

West

Terry Fox Drive

New two-lane road from Innovation Road / Flamborough Way to south of Richardson Side Road

South East

Alta Vista Transportation Corridor

New four-lane road (including two bus lanes) from Riverside Drive to Hospital Ring Road

South East

Earl Armstrong Road

Widen from two to four lanes from River Road to Limebank Road

South East

Hunt Club Road extension

New two-lane road (later four lanes) from Hawthorne Road to connect to Highway 417, including a new interchange

South East

Limebank Road

Widen from two to four lanes from Riverside Drive to south of Earl Armstrong Road

South East

Riverside Drive

Widen from two to four lanes from Hunt Club Road to Limebank Road

South East

Strandherd - Earl Armstrong Rideau River Bridge

New bridge crossing of Rideau River to tie into Earl Armstrong Road on east side of Rideau River

South West

Chapman Mills Drive

New four lane road from Strandherd Road to Woodroffe Avenue

South West

Greenbank Road

Widen from two to four lanes from Malvern Drive to Strandherd Dr.

South West

Jockvale/ Longfields Link

New four-lane road from Strandherd Drive to Jock River

South West

Longfields Drive

New two-lane road from Woodroffe Avenue to South Pointe Business Park

South West

Strandherd Drive

New four-lane road from Woodroffe Avenue to Prince of Wales Dr.

South West

Strandherd - Earl Armstrong Rideau River Bridge

New bridge crossing of Rideau River to tie into Earl Armstrong Road on east side of Rideau River

Phase 2 - 2016-2022

Sector

Project

Description

East

Belcourt Boulevard

New four-lane road from Renaud Road to Navan Road

East

Blackburn Hamlet By-pass Extension

New four-lane road from Blackburn Hamlet By-Pass to Navan Road at hydro corridor

East

Frank Kenny Road extension

New four-lane road from re-aligned Trim Road to south of Innes Road

East

Innes-Walkley-Hunt Club Link

New two-lane road (future four-lane) from Hunt Club / new Highway 417 interchange to Innes Road west of Blackburn Hamlet

East

Mer Bleue Road

New four-lane re-alignment, west of existing Mer Bleue Road, from south of Renaud Road to Navan Road

East

Navan Road

Widen from two to four lanes from Blackburn Hamlet By-pass Extension to Mer Bleue Road

East

Ottawa Road 174

Widen from four to six lanes from Blair Road to Jeanne d’Arc Blvd.

East

St. Joseph Boulevard

Widen from two to four lanes from east of Tenth Line Road to Dairy Road

East

Tenth Line Road

Widen from two to four lanes from south of Innes Road to north of urban boundary

West

Campeau Drive

Widen from two to four lanes from Kanata Road to March Road

West

Carp Road

Widen from two to four lanes from Highway 417 to Hazeldean Road

West

Eagleson Road

Widen from two to four lanes from Cadence Gate to Hope Side Road

West

Earl Grey Drive – Goulbourn Forced Road

Underpass of Terry Fox Drive

West

Hazeldean Road

Widen from two to four lanes from Iber Road to Stittsville Main Street

West

Hope Side Road

Widen from two to four lanes from Eagleson Road to Richmond Road

West

Hope Side Road

New two-lane road from Moodie Drive to Highway 416

West

Huntmar Drive

Widen from two to four lanes, two sections: Campeau Drive extension to Cyclone Taylor Boulevard, and Palladium Drive to Maple Grove Road

West

Kanata West North-South arterial

New two-lane road from Hazeldean Road to Fernbank Road

West

Kanata West Main Street

New two-lane road from Palladium Drive to Maple Grove Road

West

Palladium Drive Realignment

Realign in vicinity of Huntmar Road to new North-South arterial

West

Terry Fox Road

Widen from two to four lanes from Winchester Drive to Eagleson Road at Hope Side Road

South East

Airport Parkway

Widen from two to four lanes from Brookfield Drive to Ottawa International Airport

South East

Alta Vista Transportation Corridor

New four-lane road (including two bus lanes) from Nicholas Street / Highway 417 interchange to Riverside Drive

South East

Bank Street

Widen from two to four lanes from south of Leitrim Road to Findlay Creek Drive

South West

Cambrian Road

Widen from two to four lanes from new Greenbank Road to Jockvale Road

South West

Greenbank Road

New four lane road from near Jockvale Road to Cambrian Road, includes Jock River Bridge

South West

Jockvale Road

Widen from two to four lanes from Jock River to Prince of Wales

South West

Prince of Wales Drive

Widen from two to four lanes from Fisher Avenue to Woodroffe Avenue

South West

Strandherd Drive

Widen from two to four lanes from Fallowfield Road to Jockvale Road

Phase 3 - 2023-2031

Sector

Project

Description

East

Blackburn Hamlet Bypass (Innes Road)

Widen from four to six lanes from Innes Road (west entrance to Blackburn Hamlet) to Navan Road

East

Blackburn Hamlet By-pass Extension

New two-lane road from Trim Road to Frank Kenny Road

East

Coventry Road

Widen from two to four lanes from Belfast Road to St. Laurent Centre

West

Kanata West North-South arterial

Widen from two lanes to four lanes from Palladium Drive to Fernbank Road

West

Katimavik Road

Widen from two to four lanes from Terry Fox Drive to Eagleson Road

West

Hazeldean Road

Widen from two to four lanes from Carp Road to Stittsville Main St.

West

Maple Grove Road

Widen from two to four lanes from Terry Fox Drive to Huntmar Drive

West

March Road

Widen from two to four lanes from Old Carp Road to Dunrobin Road

West

Richmond Road

Widen to four lanes from Carling Avenue to Golden Avenue

West

Terry Fox Drive

Widen from two to four lanes from March Road to south of Richardson Side Road and widen from four to six lanes from Campeau Drive to Palladium Drive

South East

Alta Vista Transportation Corridor

New four-lane road (including two bus lanes) from Hospital Ring Road to Conroy Road at Walkley Road

South East

Bank Street

Widen from two to four lanes from Findlay Creek Drive to Parkway Road

South East

Earl Armstrong Road

Widen from two to four lanes from Limebank Road to High Road and new two-lane road from High Road to Bank Street

South East

Hunt Club Road

Widen from four to six lanes from Riverside to Bank Street

South East

Leitrim Road

Widen from two to four lanes from River Road to east of Limebank Road and new re-aligned four-lane road from east of Limebank Road to Bowesville Road

South East

Limebank Road

Widen from two to four lanes from south of Earl Armstrong Road to Mitch Owens Road

South East

New Rideau River Bridge Crossing

Additional bridge crossing across Rideau River, at a location to be determined between Hunt Club Road and future Strandherd - Earl Armstrong Bridge

South East

Riverside Drive

Widen from four to six lanes (phase 2) from Hunt Club Road to Limebank Road

South West

Barnsdale Road

Widen from two to four lanes from Highway 416 to Prince of Wales Drive, including a new interchange

South West

Fallowfield Road

Widen from two to four lanes from Strandherd Drive to Cedarview Road and from Woodroffe Avenue to Prince of Wales Drive

South West

Fallowfield Road

New four-lane road from Strandherd Drive towards Highway 416

South West

New Rideau River Bridge Crossing

Additional bridge crossing across Rideau River, at a location to be determined between Hunt Club Road and future Strandherd - Earl Armstrong Bridge

South West

Strandherd Drive

Widen from four to six lanes from Greenbank Road to Woodroffe Avenue

South West

West Hunt Club

Widen from four to six lanes from Highway 416 to Prince of Wales Drive

In addition to the roads projects shown in Figure 8.4, other road projects are under consideration by senior levels of government. Figure 8.5 identifies these projects. While the City is consulted on the projects undertaken or initiated by senior levels of government, implementation decisions ultimately rest with the responsible agency.

Figure 8.5 – Key Federal and Provincial Road Projects

Federal Government (NCC) Projects

  • Bridge crossing(s) of Ottawa River

Province of Ontario Projects

  • Highway 417 (Highway 416 to Anderson Road – roadway modifications to be confirmed)
  • Highway 417 – widening from 4 to 6 lanes plus 2 HOV lanes (Palladium Drive to Highway 416)
  • Highway 417 – widening from 4 to 6 lanes (Highway 7/17 to Palladium Drive)
  • Highway 7 – widening from a 2-lane highway to a 4-lane freeway (Highway 417 to Carleton Place)
  • Highway 417 – interchange at Hunt Club Road extension

Note: Timing of implementation for these projects depends on priorities of senior levels of government.

[ top ]