Western Corridor Light Rail Transit Environmental Assessment

The City’s 2008 Transportation Master Plan (TMP) identified the need for two Light Rail Transit (LRT) lines west of the downtown:

  • A rapid transit (LRT) line between Bayview and Baseline stations running along the Ottawa River Parkway (ORP) implemented in Phase 1
  • An at-grade east-west LRT route along Carling Avenue connecting the O-Train/ Carling and Lincoln Fields stations implemented in Phase 2

This study has the following two main objectives:

  • To re-assess the alignments identified in the 2008 TMP and identify the best corridor or corridors for the LRT line
  • Complete the Environmental Assessment (EA) for the selected corridor.

Open houses and other consultation opportunities will be offered throughout the duration of the study. Sign-up for E-news. You can also reach us directly by e-mail.

Project Information

Information on the WLRTC study is available on the City’s project web site at: ottawa.ca/westernLRT. In addition, you can send comments by email, regular mail or fax using the contact information provided below.

Project Contact

Kornel Mucsi, P. Eng.
Senior Project Manager
City of Ottawa
110 Laurier Avenue West, 4th Floor
Ottawa, ON K1P 1J1
Fax: 613-580-2578
E-mail: kornel.mucsi@ottawa.ca